Prosolia Energy commissions one of Portugal’s largest battery energy storage systems

Battery Energy Storage System (BESS) containers at Prosolia Energy's Albispark hybrid solar power plant in Castelo Branco, Portugal.
  • The BESS, with a power output of 15 MW and 60 MWh of storage capacity, has been integrated into an existing 34.4 MWp photovoltaic facility.

The commissioning of Albispark comes as Portugal’s energy sector increasingly focuses on flexibility solutions to support the integration of growing volumes of renewable generation. As solar and wind generation continue to expand, ensuring that renewable energy can be stored and delivered when needed has become a key priority.

Pedro Silva, Country Manager of Prosolia Energy in Portugal, stated: “The energy sector is entering a new phase. After years focused on expanding renewable generation capacity, the priority is now to ensure the flexibility needed to integrate that energy efficiently and securely into the grid. Energy storage plays a fundamental role in this process. In this context, Albispark, with its 60 MWh of storage capacity, represents an important step towards building the flexible and resilient energy system that Europe now needs.”.

“Energy storage plays a critical role in improving grid resilience, optimizing the use of renewable generation and supporting a more stable and efficient electricity system — one capable of meeting the future needs of consumers, businesses and industry,” added.

The project has been selected as a beneficiary of Portugal’s Recovery and Resilience Plan (PRR) under the C21 – REPowerEU programme, which aims to strengthen grid flexibility and accelerate the integration of renewable energy sources.

First international utility-scale hybridization project

Albispark also represents a strategic milestone for Prosolia Energy. It is the company’s first international utility-scale hybridization project and the first step in a wider international strategy to integrate battery storage across its renewable energy portfolio.

Building on Albispark’s success, the company plans to extend this approach to additional utility-scale projects in Portugal, including Santo Varão (Coimbra, 5.5 MW) and Algeruz (Palmela, 8 MW).

These developments reinforce Prosolia Energy’s position as one of the few IPPs operating across both utility-scale and distributed generation markets, and its commitment to leading the next phase of Europe’s energy transition, driven by the integration of BESS into renewable generation.